CERTS Logo Meetings
About EIPP Vision Organization Meetings Resource Related Sites News

 

North American SynchroPhasor Initiative (NASPI)
formerly Eastern Interconnect Phasor Project (EIPP)

Date Agenda

Location/Contribution

Author

             
September 6-7, 2007     Montreal, QB, Canada
Tell me more about the meeting.
     

 

 

 

 

 

 

 

May 9 -10, 2007

Meeting Agenda

 

Carson, CA - Working group meeting. View the attendee list.

Special Thank You to Southern California Edison Company for co-hosting this meeting.

 

 

 

 

 

 

 

 

 

 

 

 

 

PMU Applications Business Case Study: - Results and Recommendations - NASPI BMTT Plans

 

Lisa Beard

 

 

 

 

Synchronized Phasor Measurement System (SPMS) for Monitoring Transmission System at SCE

 

Bharat Bhargava / Armando Salazar

 

 

 

 

Synchronized Phasor Measurement Systems (SPMS) Vision and Challenges

 

Bharat Bhargava / Armando Salazar

 

 

 

 

Planning Implementation Task Team

 

Navin Bhatt

 

 

 

 

Operations Implementation Task Team Breakout Session Report

 

Terry Bilke

 

 

 

 

TVA SPDC Update - Phasor Applications, Tools and Visualization Techniques

 

Ritchie Carroll

 

 

 

 

NASPI Planning Committee Presentation on Data Management

 

Joe Chow

 

 

 

 

Equipment Placement Task Team - The Importance of Being Metered

 

Robert Cummings

 

 

 

 

Power Grid Monitoring and Alerting SystemAdapting

 

Tom Ferryman

 

 

 

 

Business Management Task Team Review

 

Floyd Galvan

 

 

 

 

Interconnection Update East

 

Joe Gracia / Ritchie Carroll

 

 

 

 

Integrated Information for Large Power Grids: Experience in the Western Interconnection

 

John Hauer

 

 

 

 

Use of the WECC WAMS in Staged System Tests for Validation of System Performance and Modeling

 

John Hauer

 

 

 

 

Phasor Measurement at Hydro-Québec TransÉnergie

 

Stan Johnson

 

 

 

 

Testing Phasor Aliasing and Interfering Frequencies

 

Bogdan Kasztenny

 
     

Electrical Grid Situational Awareness VERDE

 

Tom King

 

 

 

 

In Search of the Holy Grail of PMU Applications for Visualization and Prediction of Cascading Outages

 

Steve Lee

 

 

 

 

Synchronized Frequency Measurements & Applications

 

Yilu Liu

 

 

 

 

Early experience with Phasor Measurements

 

Ken Martin

 

 

 

 

Phasor Measurement System Design, Installation, & Maintenance Summary

 

Ken Martin

 

 

 

 

Research Initiatives Task Team

 

John Minnicucci / Lisa Beard

 

 

 

 

MACRODYNE INC.

 

Jay Murphy

 

 

 

 

Data & Network Management Task Team

 

Paul Myrda

 

 

 

 

Performance and Standards Task Team Progress Report

 

Damir Novosel / Zhenyu Huang

 

 

 

 

NASPI Project Transition to ERO Leadership

 

Phil Overholt / Stan Johnson

 

 

 

 

Wide Area Measurement - BPA Applications

 

Phil Overholt

 
     

SEL Synchrophasor Vision

 

Edmund Schweitzer

 
     

Testing and Calibration Procedures to Achieve PMU System Performance

 

Jerry Stenbakken / Tom Nelson

 
             
             

September 26-27, 2006

Meeting Agenda

PMU Agenda

 

St. Louis, MO - Working group meeting. View the attendee List

 
Special Thank You and Appreciation to our host Ameren and to GE Multilin and AREVA for their silver sponsorship.


 

 

 

 

 

 


Monday, September 25

 

 

 

 

 

 

Real-Time Security Assessment Using Synchrophasors

 

Mani Venkatasubramanian

 

 

 

 


Tuesday, September 26

 

 

 

 

 

 

Introduction

 

 

 

 

 

 

EIPP Working Group Status

 

Steve Widergren

 

 

 

 

PMU Placement Plan and Equipment Placement Task Team Report

 

Michael Ingram

 

 

 

 

Business Case for Phasor Measurements and Justification for Brazil PMU System

 

Damir Novosel/Rui Menezes de Moraes

 

 

 

 

 

 

 

 

 

 

 

Session 1: Phasor Hardware I

 

 

 

 

 

 

Macrodyne, Inc.

 

Jay Murphy

 

 

 

 

ABB, Inc.

 

Danny Julian

 

 

 

 

Mehta Tech, Inc.

 

Harish Mehta/Dave Bertagnolli

 

 

 

 

Arbiter Systems Inc.

 

Bruce Roeder

 

 

 

 

Ametek Power Instruments

 

Shane Haveron

 

 

 

 

 

 

 

 

 

 

 

Session 2: Phasor Hardware II

 

 

 

 

 

 

Introduction

 

Kris Koellner

 

 

 

 

Schweitzer Engineering Labs (SEL)

 

Chris Anderson

 

 

 

 

GE Multilin

 

Mark Adamiak

 

 

 

 

Qualitrol Company LLC

 

Ed Wentworth

 

 

 

 

NxtPhase

 

Krish Narendra

 

 

 

 

Utility Systems Inc.

 

Jon Goodson

 

 

 

 

 

 

 

 

 

 

 

Session 3: Phasor Data Applications I

 

 

 

 

 

 

Electric Power Group (EPG)

 

Manu Parashar

 

 

 

 

PowerWorld Corporation

 

Scott Dahman

 

 

 

 

OSIsoft

 

Chuck Wells

 

 

 

 

AREVA T&D Inc.

 

Jay Giri

 

 

 

 

 

 

 

 

 

 

 

Session 4: Phasor Data Applications II

 

 

 

 

 

 

Genscape

 

Deirdre Alphenaar

 

 

 

 

InStep Software

 

Anthony Maurer

 

 

 

 

Bigwood Systems Inc.

 

Pat Causgrove

 

 

 

 

Beacon Power

 

Chet Lyons/Yuri Makarov

 

 

 

 

 

 

 

 

 

 

 

Wednesday, September 27

 

 

 

 

 

 

NERC Update

 

Bob Cummings

 

 

 

 

 

 

 

 

 

 

 

EIPP Recent Activity Results

 

 

 

 

 

 

Phasor Availability and Data Quality

 

Paul Myrda/Terry Bilke

 

 

 

 

Synchrophasor Architecture Issues

 

Paul Myrda/Mel Gehrs

 

 

 

 

Display Conventions/Standards

 

Terry Bilke/Manu Parashar

 

 

 

 

Application Taxonomy

 

Damir Novosel/Navin Bhatt/Terry Bilke

 

 

 

 

PMU Testing Guide

 

Damir Novosel/Jerry Stenbakken

 

 

 

 

 

 

 

 

 

 

 

EIPP WG Report of Top Actions

 

 

 

 

 

 

Real-time Applications Task Team

 

Terry Bilke

 

 

 

 

Off-line Applications Task Team

 

Navin Bhatt

 

 

 

 

Data Management Task Team

 

Paul Myrda

 

 

 

 

Performance Requirements Task Team

 

Damir Novosel

 

 

 

 

 

 

 

 

 

 

 

PMU Installation and Integration Workshop

 

 

 

 

 

 

Basic PMU Considerations

 

Ken Martin

 

 

 

 

Installation Design

 

Ken Martin

 

 

 

 

PMU Performance Considerations

 

Jerry Stenbakken

 

 

 

 

Installation & Initial Checkout

 

Ken Martin

 

 

 

 

System Checkout & Acceptance

 

Ritchie Carroll

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

May 10-11, 2006

Meeting Agenda

 

Chicago, IL - Working group meeting - View the attendee List
 

 

 

 

Introduction
NERC EIPP Update Bob Cummings
EIPP WG Status Steve Widergren
NIST PMU Calibration Status and System Testing and Interoperability Guide Jerry Stenbakken
North American Phasor Overview
      East -EIPP Executive Steering Group and video (Window Media Video file format - 639 KB)   Terry Boston  
West - Performance Monitoring in the Western Interconnection Donald Davies
Texas - Phasor Activity in ERCOT Carl Imhoff
Deployment Experiences, Applications, and Plans
Tennessee Valley Authority (TVA) Mike Ingram
Southern California Edison (SCE) John Minnicucci
Manitoba Hydro Tony Weekes
Salt River Project (SRP) Kris Koellner
Trans-Elect, Inc. Paul Myrda
American Electric Power (AEP) Navin Bhatt
Task Team Reports
Executive Steering Group V. Budhraja
Equipment Placement Task Team Mike Ingram
Real-Time Task Team Terry Bilke
Off-Line Applications Task Team Navin Bhatt
Data Management Task Team Paul Myrda
Performance Requirements Task Team Damir Novosel
Applications Research
PIER Transmission Research Program James Cole
PRTT State Estimation Requirements Document Jay Giri
FNET-Frequency Measurement Update Yilu Liu
Grid Monitor 3D Visualization Pilot Floyd Galvan/Chuck Wells
Abnormality Detection by Statistical Analysis and video (AVI file format - 2,077 KB) Tom Ferryman
State Estimation Pilot Lisa Beard/Floyd Galvan
Swing Mode Estimation Dan Trudnowski

 

 

 

 

 

 

 

March 21-22, 2006

Meeting Agenda

 

Atlanta, GA - Task team working meeting - Click here to view attendee List

 

 

 

 

 

 

A Report to Congress Pursuant to Section 1839 of the Energy Policy Act of 2005. This report calls for the Electric Reliability Organization (ERO) to investigate and report on the feasibility, cost, and timeline to establish and implement an interconnection-wide monitoring system.
 

 

Phil Overholt

 

 

 

 

 

 

 

 

 

 

 

Introductions

 

 

 

 

 

 

EIPP Project Plan Overview and Current Status

Steve Widergren

 

 

 

 

NERC EIPP Update

Bob Cummings

 

 

 

 

Identification of State Estimator Metrics Impacted by Phasor Measurements

 

Sam Brattini &
Walt Stadlin

 

 

 

 


Business Management Task Team

 

 

 

 

 

 

Business Management Task Team

Floyd Galvan

 

 

 

 

Phasor Technology Research Roadmap for The Grid of the Future

 

Carl Imhoff

 

 

 

 

Statement of Principles for Historical Data Disclosure

 

Floyd Galvan

 

 

 

 


Data Management Task Team

 

 

 

 

 

 

Data Management Task Team

Paul Myrda

 

 

 

 


Off-Line Applications Task Team

 

 

 

 

 

 

Off-Line Applications Task Team

 

Ross Guttromson &  Yuri Makarov

 

 

 

 

OLATT Scope / Deliverables

 

Yuri Makarov

 

 

 

 


Performance Requirements Task Team

 

 

 

 

 

 

Phasor Measurements in State Estimation/State Solution

 

Bruce Fardanash

 

 

 

 

System Phase Reference and Its Implementation with SuperPDC (Stage 1)

 

Henry Huang &
Ritchie Carroll

 

 

 

 

State Estimation Metrics & Test Methodology

 

Sam Brattini &
Walt Stadlin

 

 

 

 

Performance Requirements Task Team Minutes

Henry Huang

 

 

 

 


Real-Time Task Team

 

 

 

 

 

 

Real-Time Task Team

Tom Rizy

 

 

 

 

PMU Sampling Philosophies

 

Kris Koellner

 

 

 

 

 

 

 

 
October 13-14, 2005 Meeting Agenda

Arlington, VA.

   
      Task Team Reports      

Project Plan Overview and Current Status

 

Matt Donnelly

Data Management Task Team Paul Myrda
Off-Line Applications Task Team Navin Bhatt
Off-Line Applications Task Team Ross Guttromson
Performance Requirements Task Team Damir Novosel
Real-Time Task Team Terry Bilke
Related Activities
California Public Interest Energy Research: Transmission Research Program Overview Jim Cole
KEMA: Metrics for PMU Impact on Power System State Estimation Sam Brattini & John Finney
NERC: EIPP Update Bob Cummings
Tennessee Valley Authority: Status of TVA's Super Phasor Data Concentrator and Comprehensive Database J. Ritchie Carroll
Vendor Material
AMETEK Power Instruments: Multi-Function Recorder & With Synchrophasor Capability John Sperr
Bigwood Systems Inc.: World-class Tools for the Utility Industry Pat Causgrove
Doubletree Systems Inc.: PMU Tester & On-demand Service Jim Cai
GE: N60 Network Stability & Synchrophasor Measurement System Mark Adamiak
NXTPhase: Accurate Voltage Sources for Synchrophasor Measurements Rich Hunt
PowerWorld: Real-Time Phasor Visualization Scott Dahman
Qualitrol: IDM Synchrophasor Measurement (PMU) Ed Wentworth
Schweitzer Engineering Laboratories, Inc.: Protective Relay Synchrophasor Measurements During Fault Conditions (Zip file 7MB)
For viewing instructions click here.
A. Guzman and S. Samineni
Southern California Edison Co.: SCE Synchronized Phasor Measurement System (SPMS) and Power System Outlook (PSO) Program Bharat Bhargava & Armando Salazar
V&R Energy: Transmission System Optimization Software Overview Dale Bradshaw
Washington State University: Report on NSF Cyber Trust Program, Relevance to Power Systems, Secure Middleware R&D David Bakken & Anjan Bose
July 12, 2005 Meeting Agenda Arlington, VA.
 
   
Business Management Task Team Floyd Galvan
Data Management Task Team Ritchie Carroll
Equipment Placement Task Team Mike Ingram
Performance Requirements Task Team Damir Novosel
Real-Time Task Team Terry Bilke
NERC EIPP Updated Bob Cummings
April 19-20, 2005 Meeting Agenda Chattanooga, TN.
 
 
Keynote Address - The Need for Increased Grid Visibility Terry Boston
NERC EIPP Update Bob Cummings
NIST SynchroMetrology Laboratory Jerry Stenbakken
Recent EPRI R&D Threads Related to Grid Operation and Planning Stephen Lee
TVA's Super Phasor Data Concentrator Architecture (PowerPoint 1.77MB)   James Ritchie Carroll
Panel 1 - Canadian Utility Experience/Plans and EIPP status

Hydro One's Perspective on Power System Monitoring

John Ciufo
Hydro Quebec TransEnergie Perspective on Phasor Measurements Danielle McNabb
Status of Dynamic Monitoring Capability at Manitoba Hydro Ally Pyl
Panel 2 - University Activities
Strategies for Placing PMUs and Benefits Gained Ali Abur
EIPP Proposal Development of Dynamic Security Assessment Tools for Synchronized Real-Time Phasor Data in the Eastern Interconnection   Joe Chow
GridStat: A Next-Generation Pub-Sub Communication Infrastructure for the Electric Power Grid and Other Critical Infrastructures   Carl Hauser
GPS/Internet Based Frequency Monitoring Network (FNET) Yilu Liu
Toward Enhanced Modeling and Decision Tools for Reliable On-Line Adaptation   Marija Llic
Task Team Reporting
Data Management Task Team Report Frank Bristol
Equipment Placement Task Team Report
Performance Requirements Task Team Report Sakis Metiopoulos
Real-Time Task Team Report
Business Management Task Team Report
Off-Line Task Team Report Navin Bhatt
December 6-7, 2004 December 6 Agenda Portland, OR.  
December 7 Agenda Current Status and Planning   Matt Donnelly
Real-Time Applications Task Team Report Terry Bilke
EIPP Modernizing North America's Electric Grid Phil Overholt
EIPP Update, RCWG/ORS, TS & IS Meetings Bob Cummings
EIPP Update, NERC Bob Cummings
EIPP Demonstration, Phase 2 Introduction   Mike Ingram & Matt Donnelly
California ISO Phasor Measurement Project
 
  David Hawkins
September 21-22, 2004 Meeting Agenda Business Management Task Team Report   Floyd Galvan
Off Line Applications Task Team Report Navin Bhatt
Phase 1 Implementation Task Team Report Mike Ingram
Real-Time Applications Task Team Report Terry Bilke
Standards and Performance Task Team Report Bruce Fardanesh
Wide Area Reliability Monitoring - TVA Ken Newberry
Vendor Material
IECSA and Phasors Herbert Falk
Northeastern US Oscillation Detection and Recording Project (Paper) David Bertagnolli
NxtPhase Recorders Rich Hunt
Real-Time Display of Aggregate Data in Electric Power Systems Scott Dahman
SEL Synchrophasors - A New View of the Power System Armando Guzman
Use of Synchronized Phasor Measurement System for EnhancingPower System Transmission Reliability
 
  Bharat Bhargava
June 17-18, 2004 Meeting Agenda Inter Control Area Networking: Current Status and Future Plans   Leonard Chamberlin
Real-Time Applications Task Team Report
 
  Jim Dyer
March 29, 2004 Meeting Agenda Current Status and Planning   Matt Donnelly
Minutes Phase 1 Implementation Task Team Report Michael Ingram
Real-Time Applications Task Team Report
 - Word file attachment
  Jim Dyer
Off-line Applications Task Team (OLATT) Report Navin Bhatt
Business Management Task Team Report Floyd Gavin
Vendor Material

ABB PSGuard Demo Video Clips (AVI file format)
  -  PSGuard Demo Line Thermal Monitoring (20 MB)
  -  PSGuard Demo SG830 WAMS (12 MB)
  -  PSGuard Demo Voltage Stability Monitoring (18 MB)

ABB (PDF file format)
  -  EIPP Introduction
  -  EIPP Presentation PSGuard WAMS Applications
  -  EIPP Presentation PSGuard WAMS System
  -  MIT Technology Review Article on WAMS

Arbiter Systems
     Synchronized Power Quality Revenue Standard
  -  Absolute Phase
  -  What is Accuracy?
  -  Model 1133a
  -  Accurate CT Calibration, Model 1133a
  -  Certification Test, Model 1133a
  -  Definitions of Energy Flow, Model 1133a
  -  Triggering, Model 1133a
  -  Functional Description, Model 1133a
  -  Conventions for Energy and Sequence Components, Model 1133a
  -  Direction of Harmonics and Flicker, Model 1133a
  -  Presentation, Model 1133a

PowerWorld Retriever Overview Presentation
 

 
January 22, 2004 Meeting Agenda Business Management Task Team Report   Floyd Galvan
Minutes Commercial Aspects of NERC Frequency Data Collection Project Don McInnis
Off-Line Applications Task Team Report Navin Bhatt
Real-Time Applications Task Team Report   Carlos Martinez &
Jim Dyer
Standards and Performance Task Team Report Sakis Meliopoulos
GE IECSA Presentation
 
  Mark Adamiak
November 18, 2003 Meeting Agenda MISO Notes   Bill Phillips

October 29, 2003

Meeting Agenda

 

Project Plan Overview and Current Status

 

Matt Donnelly

 

 

 

 

Industry Perspective

 

Navin Bhatt

 

 

 

 

Emerging Operations Applications (Grid 3P)

 

Manu Parashar

 

 

 

 

Communications & Hardware Requirements/IEEE Relay

 

Ken Martin

 

 

 

 

Planning Applications and Eastern Interconnection Dynamics

 

John Hauer

 

 

 

 

IEEE System Dynamic Performance Committee Update

 

Dick Schulz

 

             

 

 

EPG Logo LBNL Logo ORNL Logo PNNL logo PSERC logo Sandia logo

About CERTS  |  Vision  |  Organization  |  Meetings  |  Resources  |  Related Sites  |  News  |  Webmaster