|
May 10-11, 2006 |
Meeting Agenda |
|
Chicago, IL - Working group meeting
- View the attendee
List
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Introduction |
|
|
|
|
|
|
|
NERC EIPP Update |
|
Bob Cummings |
|
|
|
|
|
EIPP
WG Status |
|
Steve Widergren |
|
|
|
|
|
NIST PMU Calibration Status and System Testing and Interoperability
Guide |
|
Jerry Stenbakken |
|
|
|
|
|
|
|
|
|
|
|
|
|
North American Phasor Overview |
|
|
|
|
|
|
|
East -EIPP
Executive Steering Group and
video (Window Media Video file format - 639 KB) |
|
Terry Boston |
|
|
|
|
|
West -
Performance Monitoring in the Western Interconnection |
|
Donald Davies |
|
|
|
|
|
Texas -
Phasor Activity in ERCOT |
|
Carl Imhoff |
|
|
|
|
|
|
|
|
|
|
|
|
|
Deployment Experiences, Applications, and Plans |
|
|
|
|
|
|
|
Tennessee Valley Authority (TVA) |
|
Mike Ingram |
|
|
|
|
|
Southern California Edison (SCE) |
|
John Minnicucci |
|
|
|
|
|
Manitoba Hydro |
|
Tony Weekes |
|
|
|
|
|
Salt River Project (SRP) |
|
Kris Koellner |
|
|
|
|
|
Trans-Elect, Inc. |
|
Paul Myrda |
|
|
|
|
|
American Electric Power (AEP) |
|
Navin Bhatt |
|
|
|
|
|
|
|
|
|
|
|
|
|
Task Team Reports |
|
|
|
|
|
|
|
Executive Steering Group |
|
V. Budhraja |
|
|
|
|
|
Equipment Placement Task Team |
|
Mike Ingram |
|
|
|
|
|
Real-Time Task Team |
|
Terry Bilke |
|
|
|
|
|
Off-Line Applications Task Team |
|
Navin Bhatt |
|
|
|
|
|
Data Management Task Team |
|
Paul Myrda |
|
|
|
|
|
Performance Requirements Task Team |
|
Damir Novosel |
|
|
|
|
|
|
|
|
|
|
|
|
|
Applications Research |
|
|
|
|
|
|
|
PIER Transmission Research Program |
|
James Cole |
|
|
|
|
|
PRTT State Estimation Requirements Document |
|
Jay Giri |
|
|
|
|
|
FNET-Frequency Measurement Update |
|
Yilu Liu |
|
|
|
|
|
Grid Monitor 3D Visualization Pilot |
|
Floyd Galvan/Chuck Wells |
|
|
|
|
|
Abnormality Detection by Statistical Analysis
and video
(AVI file format - 2,077 KB) |
|
Tom Ferryman |
|
|
|
|
|
State Estimation Pilot |
|
Lisa Beard/Floyd Galvan |
|
|
|
|
|
Swing Mode Estimation |
|
Dan Trudnowski |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March 21-22, 2006 |
Meeting Agenda |
|
Atlanta, GA - Task team working meeting -
Click
here to view attendee
List |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A Report to Congress Pursuant to Section 1839 of the Energy Policy
Act of 2005. This report calls for the Electric Reliability
Organization (ERO) to investigate and report on the feasibility,
cost, and timeline to establish and implement an
interconnection-wide monitoring system.
|
|
Phil
Overholt |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Introductions |
|
|
|
|
|
|
|
EIPP Project
Plan Overview and Current Status |
|
Steve Widergren |
|
|
|
|
|
NERC EIPP Update |
|
Bob Cummings |
|
|
|
|
|
Identification of State Estimator Metrics Impacted by
Phasor Measurements |
|
Sam Brattini &
Walt Stadlin |
|
|
|
|
|
Business Management Task Team |
|
|
|
|
|
|
|
Business Management Task Team |
|
Floyd Galvan |
|
|
|
|
|
Phasor Technology Research Roadmap for The Grid of
the Future |
|
Carl Imhoff |
|
|
|
|
|
Statement of Principles for Historical Data Disclosure |
|
Floyd Galvan |
|
|
|
|
|
Data Management Task Team |
|
|
|
|
|
|
|
Data Management Task Team |
|
Paul Myrda |
|
|
|
|
|
Off-Line Applications Task Team |
|
|
|
|
|
|
|
Off-Line Applications Task Team |
|
Ross Guttromson & Yuri Makarov |
|
|
|
|
|
OLATT Scope / Deliverables |
|
Yuri Makarov |
|
|
|
|
|
Performance Requirements Task Team |
|
|
|
|
|
|
|
Phasor Measurements in State Estimation/State
Solution |
|
Bruce Fardanash |
|
|
|
|
|
System Phase Reference and Its Implementation with
SuperPDC (Stage 1) |
|
Henry Huang &
Ritchie Carroll |
|
|
|
|
|
State Estimation Metrics & Test Methodology |
|
Sam Brattini &
Walt Stadlin |
|
|
|
|
|
Performance Requirements Task Team Minutes |
|
Henry Huang |
|
|
|
|
|
Real-Time Task Team |
|
|
|
|
|
|
|
Real-Time Task Team |
|
Tom Rizy |
|
|
|
|
|
PMU Sampling Philosophies |
|
Kris Koellner |
|
|
|
|
|
|
|
|
|
|
October 13-14, 2005 |
Meeting
Agenda |
|
Arlington, VA.
|
|
|
|
|
|
|
|
Task Team Reports |
|
|
|
|
|
|
|
Project Plan Overview and Current Status |
|
Matt Donnelly |
|
|
|
|
|
Data Management Task Team |
|
Paul Myrda |
|
|
|
|
|
Off-Line Applications Task Team |
|
Navin Bhatt |
|
|
|
|
|
Off-Line Applications Task Team |
|
Ross Guttromson |
|
|
|
|
|
Performance Requirements Task Team |
|
Damir Novosel |
|
|
|
|
|
Real-Time Task Team |
|
Terry Bilke |
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Activities |
|
|
|
|
|
|
|
California Public Interest Energy Research: Transmission Research
Program Overview |
|
Jim Cole |
|
|
|
|
|
KEMA: Metrics for PMU Impact on Power System State Estimation |
|
Sam Brattini & John Finney |
|
|
|
|
|
NERC: EIPP Update |
|
Bob Cummings |
|
|
|
|
|
Tennessee Valley Authority: Status of TVA's Super Phasor Data
Concentrator and Comprehensive Database |
|
J. Ritchie Carroll |
|
|
|
|
|
|
|
|
|
|
|
|
|
Vendor Material |
|
|
|
|
|
|
|
AMETEK Power Instruments: Multi-Function Recorder & With
Synchrophasor Capability |
|
John Sperr |
|
|
|
|
|
Bigwood Systems Inc.: World-class Tools for the Utility Industry |
|
Pat Causgrove |
|
|
|
|
|
Doubletree Systems Inc.: PMU Tester & On-demand Service |
|
Jim Cai |
|
|
|
|
|
GE: N60 Network Stability & Synchrophasor Measurement System |
|
Mark Adamiak |
|
|
|
|
|
NXTPhase: Accurate Voltage Sources for Synchrophasor Measurements |
|
Rich Hunt |
|
|
|
|
|
PowerWorld: Real-Time Phasor Visualization |
|
Scott Dahman |
|
|
|
|
|
Qualitrol: IDM Synchrophasor Measurement (PMU) |
|
Ed Wentworth |
|
|
|
|
|
Schweitzer Engineering Laboratories, Inc.: Protective Relay
Synchrophasor Measurements During Fault Conditions (Zip file 7MB)
For viewing instructions
click here. |
|
A. Guzman
and S. Samineni |
|
|
|
|
|
Southern California Edison Co.: SCE Synchronized Phasor Measurement
System (SPMS) and Power System Outlook (PSO) Program |
|
Bharat Bhargava & Armando Salazar |
|
|
|
|
|
V&R Energy: Transmission System Optimization Software Overview |
|
Dale Bradshaw |
|
|
|
|
|
Washington State University: Report on NSF Cyber Trust Program,
Relevance to Power Systems, Secure Middleware R&D |
|
David Bakken & Anjan Bose |
|
|
|
|
|
|
|
|
|
|
July 12, 2005 |
Meeting Agenda |
|
Arlington, VA.
|
|
|
|
|
|
|
|
Business Management Task Team |
|
Floyd Galvan |
|
|
|
|
|
Data Management Task Team |
|
Ritchie Carroll |
|
|
|
|
|
Equipment Placement Task Team |
|
Mike Ingram |
|
|
|
|
|
Performance Requirements Task Team |
|
Damir Novosel |
|
|
|
|
|
Real-Time Task Team |
|
Terry Bilke |
|
|
|
|
|
NERC EIPP Updated |
|
Bob Cummings |
|
|
|
|
|
|
|
|
|
|
April 19-20, 2005 |
Meeting Agenda |
|
Chattanooga, TN.
|
|
|
|
|
|
|
|
Keynote Address -
The Need for Increased Grid Visibility |
|
Terry Boston |
|
|
|
|
|
|
|
|
|
|
|
|
|
NERC EIPP Update |
|
Bob Cummings |
|
|
|
|
|
NIST SynchroMetrology Laboratory |
|
Jerry Stenbakken |
|
|
|
|
|
Recent EPRI R&D Threads Related to Grid Operation and Planning |
|
Stephen Lee |
|
|
|
|
|
TVA's Super Phasor Data Concentrator Architecture (PowerPoint
1.77MB) |
|
James Ritchie Carroll |
|
|
|
|
|
|
|
|
|
|
|
|
|
Panel 1 - Canadian Utility Experience/Plans and
EIPP status |
|
|
|
|
|
|
|
Hydro One's Perspective on Power System Monitoring |
|
John Ciufo |
|
|
|
|
|
Hydro Quebec TransEnergie
Perspective on Phasor Measurements |
|
Danielle McNabb |
|
|
|
|
|
Status of Dynamic Monitoring Capability at Manitoba Hydro |
|
Ally Pyl |
|
|
|
|
|
|
|
|
|
|
|
|
|
Panel 2 - University Activities |
|
|
|
|
|
|
|
Strategies for Placing PMUs and Benefits Gained |
|
Ali Abur |
|
|
|
|
|
EIPP Proposal Development of Dynamic Security Assessment Tools for
Synchronized Real-Time Phasor Data in the Eastern Interconnection |
|
Joe Chow |
|
|
|
|
|
GridStat: A Next-Generation Pub-Sub Communication Infrastructure for
the Electric Power Grid and Other Critical Infrastructures |
|
Carl Hauser |
|
|
|
|
|
GPS/Internet Based Frequency Monitoring Network (FNET) |
|
Yilu Liu |
|
|
|
|
|
Toward Enhanced Modeling and Decision Tools for Reliable On-Line
Adaptation |
|
Marija Llic |
|
|
|
|
|
|
|
|
|
|
|
|
|
Task Team Reporting |
|
|
|
|
|
|
|
Data Management Task Team Report |
|
Frank Bristol |
|
|
|
|
|
Equipment Placement Task Team Report |
|
|
|
|
|
|
|
Performance Requirements Task Team Report |
|
Sakis Metiopoulos |
|
|
|
|
|
Real-Time Task Team Report |
|
|
|
|
|
|
|
Business Management Task Team Report |
|
|
|
|
|
|
|
Off-Line Task Team Report |
|
Navin Bhatt |
|
|
|
|
|
|
|
|
|
|
December 6-7, 2004 |
December 6 Agenda |
|
Portland, OR. |
|
|
|
|
|
December 7 Agenda |
|
Current Status and Planning |
|
Matt Donnelly |
|
|
|
|
|
Real-Time Applications Task Team Report |
|
Terry Bilke |
|
|
|
|
|
|
|
|
|
|
|
|
|
EIPP Modernizing North America's Electric Grid |
|
Phil Overholt |
|
|
|
|
|
EIPP Update, RCWG/ORS, TS & IS Meetings |
|
Bob Cummings |
|
|
|
|
|
EIPP Update, NERC |
|
Bob Cummings |
|
|
|
|
|
EIPP Demonstration, Phase 2 Introduction |
|
Mike Ingram & Matt Donnelly |
|
|
|
|
|
California ISO Phasor Measurement Project
|
|
David Hawkins |
|
|
September 21-22, 2004 |
Meeting Agenda |
|
Business Management Task Team Report |
|
Floyd Galvan |
|
|
|
|
|
Off Line Applications Task Team Report |
|
Navin Bhatt |
|
|
|
|
|
Phase 1 Implementation Task Team Report |
|
Mike Ingram |
|
|
|
|
|
Real-Time Applications Task Team Report |
|
Terry Bilke |
|
|
|
|
|
Standards and Performance Task Team Report |
|
Bruce Fardanesh |
|
|
|
|
|
Wide Area Reliability Monitoring - TVA |
|
Ken Newberry |
|
|
|
|
|
|
|
|
|
|
|
|
|
Vendor Material |
|
|
|
|
|
|
|
IECSA and Phasors |
|
Herbert Falk |
|
|
|
|
|
Northeastern US Oscillation Detection and Recording Project (Paper) |
|
David Bertagnolli |
|
|
|
|
|
NxtPhase Recorders |
|
Rich Hunt |
|
|
|
|
|
Real-Time Display of Aggregate Data in Electric Power Systems |
|
Scott Dahman |
|
|
|
|
|
SEL Synchrophasors - A New View of the Power System |
|
Armando Guzman |
|
|
|
|
|
Use of Synchronized Phasor Measurement System for EnhancingPower
System Transmission Reliability
|
|
Bharat Bhargava |
|
|
June 17-18, 2004 |
Meeting Agenda |
|
Inter Control Area Networking: Current Status and Future Plans |
|
Leonard Chamberlin |
|
|
|
|
|
Real-Time Applications Task Team Report
|
|
Jim Dyer |
|
|
March 29, 2004 |
Meeting
Agenda |
|
Current Status and Planning |
|
Matt Donnelly |
|
|
|
Minutes |
|
Phase 1 Implementation Task Team Report |
|
Michael Ingram |
|
|
|
|
|
Real-Time Applications Task Team Report
- Word file attachment |
|
Jim Dyer |
|
|
|
|
|
Off-line Applications Task Team (OLATT) Report |
|
Navin Bhatt |
|
|
|
|
|
Business Management Task Team Report |
|
Floyd Gavin |
|
|
|
|
|
|
|
|
|
|
|
|
|
Vendor Material |
|
|
|
|
|
|
|
ABB PSGuard Demo Video Clips (AVI file format)
-
PSGuard Demo Line Thermal Monitoring (20 MB)
-
PSGuard Demo SG830 WAMS (12 MB)
-
PSGuard Demo Voltage Stability Monitoring (18 MB)
ABB (PDF file format)
-
EIPP Introduction
-
EIPP Presentation PSGuard WAMS Applications
-
EIPP Presentation PSGuard WAMS System
-
MIT Technology Review Article on WAMS
Arbiter Systems
Synchronized Power Quality Revenue Standard
-
Absolute Phase
-
What is Accuracy?
-
Model 1133a
-
Accurate CT Calibration, Model 1133a
-
Certification Test, Model 1133a
-
Definitions of Energy Flow, Model 1133a
-
Triggering, Model 1133a
-
Functional Description, Model 1133a
-
Conventions for Energy and Sequence Components, Model 1133a
-
Direction of Harmonics and Flicker, Model 1133a
-
Presentation, Model 1133a
PowerWorld Retriever Overview Presentation
|
|
|
|
|
January 22, 2004 |
Meeting Agenda |
|
Business Management Task Team Report |
|
Floyd Galvan |
|
|
|
Minutes |
|
Commercial Aspects of NERC Frequency Data Collection Project |
|
Don McInnis |
|
|
|
|
|
Off-Line
Applications Task Team Report |
|
Navin Bhatt |
|
|
|
|
|
Real-Time Applications Task Team Report |
|
Carlos Martinez &
Jim Dyer |
|
|
|
|
|
Standards and Performance Task Team Report |
|
Sakis Meliopoulos |
|
|
|
|
|
GE IECSA
Presentation
|
|
Mark Adamiak |
|
|
November 18, 2003 |
Meeting Agenda |
|
MISO Notes |
|
Bill Phillips |
|
|
|
|
|
|
|
|
|
|
October
29, 2003 |
Meeting Agenda |
|
Project Plan Overview and Current Status |
|
Matt Donnelly |
|
|
|
|
|
Industry Perspective |
|
Navin Bhatt |
|
|
|
|
|
Emerging Operations Applications
(Grid 3P) |
|
Manu Parashar |
|
|
|
|
|
Communications & Hardware Requirements/IEEE Relay |
|
Ken Martin |
|
|
|
|
|
Planning Applications and Eastern Interconnection Dynamics |
|
John Hauer |
|
|
|
|
|
IEEE System
Dynamic Performance Committee Update |
|
Dick
Schulz |
|
|
|
|
|
|
|
|
|